Two data centers, a continent apart

Hosting runs from two independent US sites, one in central Florida and one in northern Utah. Separate buildings, separate power grids, separate weather.

Showing day and night as they are now.

  • 1 Tbps+blended uplink from four carriers at the Utah site
  • ~100 Gbpsof redundant fiber into the Florida site
  • 125,000+square feet of facility space across both sites
  • 99.998%network uptime, guaranteed in writing

Two sites, side by side

Servers are housed in two US data centers, close to 1,900 miles apart. Nothing is shared between them: not the building, not the grid, not the storms.

Both sites online.

East

Central Florida

Building
25,000 sq ft, privately run, built to a Tier III design.
Weather
Concrete masonry walls, rated to ride out a Category 4 hurricane.
Power
Two UPS units running in parallel with a spare (N+1), backup battery cabinets, and diesel generators with 8,000 gallons of fuel on site.
Cooling
500+ tons of capacity, holding 72°F (22°C) and 45% humidity, with hot and cold aisles kept apart.
Security
Staff on site around the clock, a mantrap with badge-only entry, facial recognition and more than 50 cameras.
Network
Close to 100 Gbps of redundant fiber from several tier 1 carriers, plus two 10G links to a major Miami internet exchange, 5 ms away.
West

Northern Utah

Building
More than 100,000 sq ft of floor space.
Power
Fed from two separate utility grids, with N+1 UPS and four diesel generators, and more being added.
Network
Over 1 Tbps of blended uplink from four carriers.
Reach
Several 100G paths to a heavily peered Los Angeles edge, for short routes to Asia and the rest of the world.
Routing
Every path is measured all the time, and traffic is steered to the one with the lowest latency and loss.

Power · both sites

Pull the plug

Utility power is only the first layer. This is what happens in the seconds after it fails.

  1. The grid drops. In Utah a second utility feed, from a separate grid, is already connected. Utah
  2. Batteries take the load, with no gap. UPS systems with a spare unit carry the servers the instant the feed fails. Both
  3. Diesel starts. Generators come up and take over. Florida keeps 8,000 gallons of fuel on site; Utah runs four generators, with more being added. Both
  4. The servers never notice. Power to the racks stays on the whole time.

Running on utility power. An illustration, not live readings.

Cooling · Florida site

Held at 72°F / 22°C

Move across the racks to throw heat at them, and watch the room pull it back.

  • 72°F (22°C), 45% humidity, held with precision control.
  • 500+ tons of cooling from dozens of high-capacity air conditioning units.
  • Hot and cold aisles contained, so exhaust air never mixes back into the intake.

Room at 72°F / 22°C. An illustration, not live readings.

Routing · Utah site

The quickest path, picked again and again

Four carriers leave the building. Probes time every path, all the time, and traffic moves to whichever is fastest. Click a path to jam it.

  • Four carriers, over 1 Tbps of uplink between them.
  • Lowest latency and loss decides the route, not a fixed preference.
  • Several 100G paths to a heavily peered Los Angeles edge.

Traffic on carrier A. Sample figures.

Access · Florida site

Four checks before the servers

Nobody walks in. Step through what it takes to reach a rack.

  1. Badge. Entry points open to an authorized badge only.
  2. Mantrap. The outer door has to close before the inner one will open.
  3. Face scan. Biometric facial recognition confirms who is holding the badge.
  4. On camera. More than 50 cameras watch the floor, and staff are on site around the clock.

Door locked.

Host somewhere built to stay up

Every hosting plan is served from these two sites, with 99.998% network uptime in writing.